Challenge

The Government of Sri Lanka and the Liberation Tigers of Tamil Eelam had signed a ceasefire agreement allowing reconstruction of the conflict effected areas and rehabilitation of the communities affected.

During the conflict the infrastructure in the affected areas was either directly damaged by hostilities or suffered incremental decay as routine maintenance was not safe or practical. Travelling in conflict affected areas was painstakingly slow, hampered by delays and virtually impassable by heavy goods vehicles. Reconstructing infrastructure became an immediate priority.

Solution

Mabey, supported by the British Government, worked with the Government of Sri Lanka to identify, on national ‘A’ roads and priority routes in the North and East of the island, bridges that needed reconstructing to allow the free flow of raw material and resources to allow reconstruction to begin.

A project consisting of 89 bridges and 2 ferries was collated and assigned to the Ministry of Rehabilitation, Resettlement and Refugees and once financial support was secured from the British Government, the project officially started in October 2003.

In November of that year, the first shipment of permanent 2-lane steel bridges arrived at Colombo port.

Result

Working with local contractors, the Ministry was able to complete 48 bridges by the end of 2005; the rest being installed in the final year of the project. The use of local contractors and local industry skills ensured employment for the local people and prosperity for the local community.

Products

Mabey Atlas Bridge

Ideal for permanent highway bridges and inner city flyovers, our Atlas bridges provide a lightweight super-structure which is pre-fabricated for rapid installation.

view product

Mabey Atlas Light Bridge

A lightweight steel bridge which is fully pre-fabricated, galvanised and quick to install in permanent and temporary applications.

view product

Mabey Compact 200

Mabey’s most popular modular bridging system. Supplied in a variety of spans and widths, and configured from pre-engineered components for ease of installation

view product

Mabey Composite Bridge

Our composite bridges are rapid-build steel solutions combined with concrete decks, and supplied with a comprehensive Design and Fabricate service to support permanent bridging applications

view product

Mabey Delta Bridge

Our Delta Bridges provide a proprietary, permanent modular bridging solution well-suited to long span bridging requirements in both main highway and rural applications

view product

Mabey Pedestrian Bridge

Pedestrian bridges are quick and easy to erect, the Mabey solution is designed for both permanent and temporary pedestrian applications

view product

browse more products