Challenge
The Ponfeigh Bridge near the town of Douglas Water in South Lanarkshire was an overbridge that spanned over an original stone arch structure. The overbridge closed in 2016, as it was deemed too dangerous for both vehicle and pedestrian users. It was finally demolished in 2019 after a defective water main caused further deterioration, rendering it unrepairable. The waters underneath the crossing are renowned for salmon breeding, so it was essential to minimise any potential disruption to the river flow or the surrounding area, which is high in flora species. The topography of the river banks also required the replacement crossing to have a 3% slope between abutments.
South Lanarkshire Council chose a modular steel Delta™ bridge for this project, as it met the loading requirements in a single span, without the need for piers sited in the river bed. It offered a ‘cleaner’ environmental solution by avoiding obstacles to the water flow and preserving the surrounding land with no requirements for a large crane or an assembly area.
Solution
The newly installed 36m single-span Delta™ provides a 4.2m roadway and one 1.05m wide internal footwalk. It is supported by two new reinforced-concrete abutments, in line with the footprint of the existing structure and no extra weight restrictions. The roads on both sides were rerouted to offer a better approach to the replacement bridge.
As the bridge could be assembled and launched from the approach road site, the main contractor, I & H Brown Limited, utilised the existing restricted construction space and avoided the need to prepare specific areas for a large crane or the bridge assembly. Within three weeks from the arrival of the components, the Delta™ was assembled and launched uphill, then jacked down onto its bearings. The bridge was launched fully decked, thereby keeping the work across the river to an absolute minimum.
Result
Opening five weeks ahead of schedule, the modular bridge has re-instated the two-way access to Douglas Waters, as per Lanarkshire County’s requirements for all villages. Emergency vehicles now have an alternative route in and out of the area. The project successfully replaced a vital link with the least possible environmental disturbance.
Products
Bridge Design Services
Bridge design services to ensure your bridge meets your specification and is fit for purpose
view productBridge Installation Advice
Bridge installation advice to ensure a rapid, safe and trouble-free bridge-build.
view productMabey Delta Bridge
Our Delta Bridges provide a proprietary, permanent modular bridging solution well-suited to long span bridging requirements in both main highway and rural applications
view productRelated Projects
Caroni Delta Bridge, Trinidad and Tobago
Government, Infrastructure
Bridging, Engineering and Project Services
Caroni, Trinidad and Tobago
His Highness Sheikh Khalifa Bin Zayed Al Nahyan Bridge, Pakistan
Government, Infrastructure
Bridging, Engineering and Project Services
Swat River, Pakistan
Quebec, Canada
Government, Infrastructure, Transport
Bridging, Engineering and Project Services, Major Projects
Canada